1
2
3
4
COUR TES Y OF PO WERHOUSE EN TERPRISES
modular components assembled at the
PowerPod factory are shipped [ 1] to the
building site by flatbed truck. Concrete
piers with steel brackets [ 2] are installed by
a site contractor before the pod is delivered.
The body of the pod is lifted onto the piers
[ 3] and then secured to them. Finally, the
solar roof [ 4] is placed onto the pod base.
Custom Home Building
S+H
construction
Renovations & Additions
2007
Best General
Contractor
QUALI T Y • INTEGRI T Y • VALUE
Historical Renovations
26 New Street, Cambridge, MA 02138
617-876-8286
www.shconstruction.com
Landscaping & Site Work
Best Kitchen
Remodeling